Dudley’s Excavating, Inc.
Call us 530-385-1445 Radio-dispatched from Gerber, CA
Northern California · Class A #694077
Or get in touch →
Contact Us
Inside a Dudley's directional bore — drill head advancing through red clay

Directional
Boring

Horizontal directional drilling installs gas, water, sewer, power and fiber lines beneath streets, highways, streams and railroads without opening the surface.

Scroll
Why trenchless

Less disruption,
cleaner results

Open trenching across a highway requires traffic control, detours and pavement restoration. A directional bore needs only an entry and exit pit, keeping roads open and surfaces intact while we guide the line precisely to its target.

  • Streets & highways — crossings beneath the traveled way with minimal encroachment.
  • Streams & waterways — no in-channel disturbance and simpler permitting.
  • Railroads — bored crossings built to railroad specifications.
  • Driveways & finished frontage — installations beneath concrete and landscaping without damage.
  • Rock & cobble capable
  • Vermeer D23x30DR S3 class rigs
  • Vacuum potholing
  • HDPE fusion on site
Directional drill rig pushing rod on a mountain job
Directional drilling on a mountain project
Fusing fiber conduit in the Camp Fire burn scar
Case study · Camp Fire restoration

Paradise: 40 miles of underground fiber

The 2018 Camp Fire destroyed much of the infrastructure serving Paradise. Dudley’s crews have supported the AT&T fiber restoration since — installing 40 miles of underground fiber through red clay, rock cobble, and granite over a 6-year program.

40 miUnderground fiber
6 yrProject length
AT&TClient

Read the case study →

Dudley’s crew fusing conduit in the Camp Fire burn area
How we bore

Our directional
drilling process

Every bore starts with planning. We locate and expose existing utilities by vacuum excavation, fuse the product pipe on site and install it in one continuous run.

  • Locate & expose — vacuum excavation confirms existing utilities before drilling.
  • Pilot bore — a guided drill head, tracked from the surface through clay, cobble and rock.
  • Ream & pull back — fused HDPE installed in a single continuous length.
  • Restore — pits backfilled, shoulders restored and disturbed areas hydroseeded.
Vacuum potholing to expose utilities before boring
Vacuum potholing before drilling

Directional boring projects

Bore rig set up on the highway shoulder at first light
27-foot 1-inch bore under a finished driveway — surface untouched
Bore pits and product pipe in native red earth
Rig walking the shoulder between shots
Fused HDPE strung and ready to pull
Butt-fusing HDPE on the hillside
Vac crew daylighting a live line under traffic control
Potholing tight to landscape — surgical, not scorched-earth
Open trench crossing in native red dirt
Directional boring · Trenchless

Trenchless crossings,
surface intact

Roads, driveways, creeks and rail lines — we install gas, water, power and fiber beneath them without open cuts or closures. Share your project details and our team will follow up to discuss scope and scheduling. Public agencies and prime contractors may request our capability statement.

Contact Us → Call 530-385-1445